CRANE LAKE WATER
& SANITARY DISTRICT (CLWSD)
BOARD OF MANAGERS
REGULAR MEETING
October 1, 2003 –
7:30 PM
CRANE LAKE CHAPEL FELLOWSHIP HALL
Regular Meeting
The meeting was called to order by Chairman Michael White at
7:35PM.
Members present: Managers Darrell Scott, Mike White, Deena
Congdon and Bud Bystrom.
Members absent: Jim Sanborn
Also present: Jim Pucel of RLK-Kuusisto Ltd., Clerk Jo Ann
Pohlman, a reporter from the Cook News-Herald, a reporter from the Voyageur
Sentinel and 3 members of the community.
BUSINESS:
Motion by B. Bystrom supported by
D. Scott to approve the minutes of the Regular Meeting of September 17,
2003. Motion carried.
Chairman M. White reviewed the
Treasurer’s Report. A motion was made by D. Congdon, supported by D. Scott to
approve the September Treasurer’s Report; and the payment of the following
bills. Administrative: Ely Minnesota - $194.40, M.J. White -
$64.85, and Range Print Shop - $171.34; Project: Wagner Construction - $28,733.89, Rice Lake - $160,112.03, RLK-Kuusisto - $10,141.78, Cope &
Peterson - $900.00, Environmental Financial Group - $7,791.18, and NTS -
$490.00. Motion carried.
Correspondence:
- The correspondence was presented to the Board.
- A motion was made by D. Scott, supported by B.
Bystrom that the correspondence be placed on file and acted upon as
required. Motion carried.
RLK-Project Status Report
- Construction-Wastewater Collection System – Wagner
completed the mainline on Bayside Drive and the mainline from the outlet
structure at the discharge point to Voyagaire Lodge. For the remainder of the week, the
Contractor will install the mainline from Voyagaire Lodge south to the
connection point on C.S.A.H. 24.
Then Wagner will continue on Hilltop Road.
- Construction-Wastewater Treatment System – Rice Lake
completed the wall pour and stripped the forms. The Contractor is scheduled to waterproof the walls,
complete the piping connections at the building, backfill around the
building and continue working on the sand filter.
- Grinder Pump information was provided to the Board
and Rob Scott.
- There was communication with Cope & Peterson
regarding easement status.
- RLK is meeting with Lake Country Power on October 8
for power to the Lift Station and Treatment Site.
- A work order has been placed for service with
Frontier for phone service to the Lift Station and Treatment Site. Work is to be performed in mid October.
Grinder Pumps
- The
decision on the grinder pumps will be postponed until the next meeting.
Easements/Right-of-Way Issues
- D. Congdon reported that there are ten easements
outstanding; most are related to mortgage companies.
Special Assessments
- A
Notice of Hearing on Assessments for Sanitary Sewer Improvement was mailed
to each property owner in the Western Service Area.
- The
total amount of the project to be assessed is $638,000.00. This is based on the grinder pump cost,
service lines related to the equipment and infrastructure.
- There
will be a Hearing on October 11,2003 at 1PM at the Crane Lake Chapel
Fellowship Hall where written and oral objections will be considered and
accepted.
- No
appeal may be taken as to the amount of any assessment adopted by the
Board of Managers unless a written objection signed by the affected
property owner is filed with the Secretary prior to the assessment hearing
or presented to the presiding officer at the hearing.
- Answers
will not be given at the hearing but will be taken under advisement with
the engineers, attorneys and other experts.
Accounting System
- Research on an accounting system is still in progress.
Ordinance
·
Two
ordinances were adopted at the last meeting.
- The
ordinances are printed and will be mailed to WSA property owners in the
next few days.
- The
ordinances are on the CLWSD website at www.clwsd.org.
Eastern Service Area (ESA)
- M. White met with John Jamnick a week ago and they
agreed that John Jamnick would put together a plan for an approach to the
ESA.
- The concurrence on the approach must include input
from agencies such as the MPCA, St. Louis County and Rural Development.
- Holding tanks at lake properties with barging and
introduction to the treatment plant remains an option. This would increase
the number of users sharing the cost of the treatment plant.
Rainy River Basin Plan
- M. White downloaded a copy of the MPCA plan from their website for the
files.
- The report includes concerns of the waterways from
Rainy River to Itasca County.
- The Clerk has a copy of the Plan and it is available
for review.
2002 Financial Statements
- The Financial Statements have been completed and
received from the District Accountant and are available for review.
OTHER BUSINESS
M. White has received a draft
contract from Northeast Technical Services (NTS), which will be reviewed by the
Board and Mary Frances Skala of Fryberger, Buchanan et al before acceptance.
Request for Injunction – A
telephone conference was held on 9/23/03 with the Crane Lake Property Owners
for Common Sense Attorney, our attorney, Joseph Mihalek and the Judge as to
payment of incurred expenses as a result of the Injunction. The Judge has taken the question under
advisement.
Bud Bystrom presented a copy of
the Lake Assessment Program, 2001 to the Clerk for the files and copies of the
Water Quality Data were presented. It
was agreed by the Board, as stated in the report, that this report was
inconclusive as both lakes (Crane and Little Vermilion) lacked sufficient data
to assess trends in water quality and there was an unusually high amount of
rainfall in 2001.
PUBLIC COMMENTS
Public Comments included questions
about water quality in other lakes feeding into Crane Lake.
J. Pohlman
Clerk
NEXT MEETING: OCTOBER 15, 2003 AT THE CRANE LAKE
FELLOWSHIP HALL AT 7:30PM.
HEARING: OCTOBER 11, 2003
AT THE CRANE LAKE FELLOWSHIP HALL AT 1PM.